Typical scenario, the builder has been stuck on a job, so whereas it was meant to be done in September, my repointing looks to be starting about the 10th of October.
I've got the lime putty etc all ready to go, old mortar has been raked out, hessian sheeting for protection after it's done.
Single-storey building, 12 x 3m.
Is it safe/wise to use lime putty at this time of year?
The weather looks mild coming up, and the temps don't appear to be dropping below 7 degrees for a while anyway.
I've got the lime putty etc all ready to go, old mortar has been raked out, hessian sheeting for protection after it's done.
Single-storey building, 12 x 3m.
Is it safe/wise to use lime putty at this time of year?
The weather looks mild coming up, and the temps don't appear to be dropping below 7 degrees for a while anyway.