Thank yiuYeah our UFH is mostly installed over concrete with one room having a suspended floor. The original suspended floors were removed and the gap filled in and then covered in asbestos tiles at some point in the past, we simply layered on top. There was no point removing the old tiles or the concrete. The suspended floor had no original bits either - it's chipboard over beams on concrete plinths. Walls are breathable now to accommodate any moisture forced up. We had to replace several parts of the sole plates though, that wasn't cheap.