Hi all
After removing all the internal plaster (read concrete!) from the inside of the external facing walls, I recently completed the base/levelling coat
I'm using the Ty Mawr system so next will be fitting of the 60mm Multitherm wood fibre boards using Isovit adhesive and Ejot mechanical fixings BUT I fear the clock is ticking
I was hoping to have this project completed before Christmas so a full heat pump/central heating system could be installed but my daughter had health issues over the summer, consequently the projects progress has been delayed. So now the clock is ticking and I'm concerned the seasons may be against me.
* According to the Ty Mawr website any newly applied substrate needs 28 days cure time prior to applying the Isovit adhesive and boards
* The hemp lime plaster top coat cannot be applied in sub 5 degree temps
* The ready mixed hemp lime bags have been in the garage on a pallet and covered in several dust sheets for nye on 3 months when the instructions advise to use with 4 weeks
At present my cottage has just a single log burner and a tiny oil filled rad in each bedroom and its very cold, So my questions are:
* Does the base coat really need 28 days to cure?
* Do you think the ready mixed hemp lime will still be ok to use?
Aside from having to throw the ready mixed hemp lime away, the worst case scenario is fixing the wood fibre boards in place and postponing the top coat and subsequent central heating until Spring when it warms up. (Far easier to apply the top coat prior to radiators and pipework being fitted.
Hopefully I'm being over cautious and I can just crack on with it but I'm grateful for any advice.
Regards
After removing all the internal plaster (read concrete!) from the inside of the external facing walls, I recently completed the base/levelling coat
I'm using the Ty Mawr system so next will be fitting of the 60mm Multitherm wood fibre boards using Isovit adhesive and Ejot mechanical fixings BUT I fear the clock is ticking
I was hoping to have this project completed before Christmas so a full heat pump/central heating system could be installed but my daughter had health issues over the summer, consequently the projects progress has been delayed. So now the clock is ticking and I'm concerned the seasons may be against me.
* According to the Ty Mawr website any newly applied substrate needs 28 days cure time prior to applying the Isovit adhesive and boards
* The hemp lime plaster top coat cannot be applied in sub 5 degree temps
* The ready mixed hemp lime bags have been in the garage on a pallet and covered in several dust sheets for nye on 3 months when the instructions advise to use with 4 weeks
At present my cottage has just a single log burner and a tiny oil filled rad in each bedroom and its very cold, So my questions are:
* Does the base coat really need 28 days to cure?
* Do you think the ready mixed hemp lime will still be ok to use?
Aside from having to throw the ready mixed hemp lime away, the worst case scenario is fixing the wood fibre boards in place and postponing the top coat and subsequent central heating until Spring when it warms up. (Far easier to apply the top coat prior to radiators and pipework being fitted.
Hopefully I'm being over cautious and I can just crack on with it but I'm grateful for any advice.
Regards